European Tyre Manufacturer
The ongoing costs of the existing setup was measured at 80KW/h & 8p/w/h made, making their estimated yearly running cost of £58.4k. Our technology used 1KW/h saving approx 95% of that cost, £55.48K. In addition to this we calculated the annual cost of filtration was £154k + labour. Based on these findings our system paid for itself in 12 months.